Alighting platform | |||||||||||||
| Chinese name | |||||||||||||
| Simplified Chinese | 坪地六联 | ||||||||||||
| Traditional Chinese | 坪地六聯 | ||||||||||||
| |||||||||||||
| General information | |||||||||||||
| Location | Liulian Village (六联村) Pingdi Subdistrict, Longgang District, Shenzhen, Guangdong China | ||||||||||||
| Coordinates | 22°47′23.003″N 114°19′1.715″E / 22.78972306°N 114.31714306°E | ||||||||||||
| Operated by | SZMC (Shenzhen Metro Group) | ||||||||||||
| Line | Line 3 | ||||||||||||
| Platforms | 2 (2 side platforms) | ||||||||||||
| Tracks | 2 | ||||||||||||
| Construction | |||||||||||||
| Structure type | Underground | ||||||||||||
| Accessible | Yes | ||||||||||||
| History | |||||||||||||
| Opened | 28 December 2024 | ||||||||||||
| Services | |||||||||||||
| |||||||||||||
| |||||||||||||
Pingdi Liulian station (simplified Chinese: 坪地六联; traditional Chinese: 坪地六聯; pinyin: Píngdì Liùlián Zhàn; Jyutping: Ping4dei6 Luk6lyun4 Zaam6; Cantonese Yale: Pìngdei Luhklùn Jaahm) is a station on Line 3 of Shenzhen Metro. It opened on 28 December 2024,[1] and is located underground in Pingdi Subdistrict in Longgang District. It is the northern terminus of the line.[2]
The station is part of the fourth phase of Line 3 (East Extension).[3][4]
- Art wall
Station layout
| G | - | Exits |
| B1F Concourse |
Lobby | Ticket Machines, Customer Service, Shops, Vending Machines |
| B2F Platforms |
Side platform, doors will open on the right | |
| Platform | ||
| Platform | 3 termination platform | |
| Side platform, doors will open on the right | ||
Entrances/exits
The station has 4 points of entry/exit, with Exits A and C being accessible via elevators. Exit B has a toilet.
- Entrance A
- Entrance B
- Entrance C
- Entrance D
References
- ↑ "定了!深圳地铁13号线南段明日开通" [It’s settled! The southern section of Shenzhen Metro Line 13 will open tomorrow]. Shekou News (in Simplified Chinese). 27 December 2024. Retrieved 19 January 2025.
- ↑ "深圳地铁3号线东延线近期开建,延至低碳城和坪地" [Shenzhen Metro Line 3 East Extension Line will be built soon, extending to Low Carbon City and Pingdi]. Shenzhen Business Daily (in Simplified Chinese). 28 July 2020. Archived from the original on 8 October 2020. Retrieved 19 January 2025.
- ↑ "深圳地铁集团党委书记、董事长辛杰参加《民心桥》节目听众问题的落实情况" [The implementation of the audience's questions raised by Xin Jie, Party Secretary and Chairman of Shenzhen Metro Group, on the "Bridge of People's Hearts" program]. Shenzhen Government Online (in Simplified Chinese). 8 September 2020. Archived from the original on 9 October 2020.
- ↑ "深圳地铁3号线东延"可研"获批!开工在即!建设工期为5年" [Shenzhen Metro Line 3 East Extension "Feasibility Study" approved! Construction is about to start! The construction period is 5 years]. Shenzhen News Network (in Simplified Chinese). 24 July 2020. Archived from the original on 9 October 2020. Retrieved 19 January 2025.
External links
- Shenzhen Metro official page (Chinese)
- Shenzhen Metro official page (English)
- Street map
