Mawu station

Wikipedia

Mawu

马务
Guangzhou Metro
Platform 1
Chinese name
Simplified Chinese马务站
Traditional Chinese馬務站
Transcriptions
Standard Mandarin
Hanyu PinyinMǎWù Zhàn
Yue: Cantonese
Yale RomanizationMáamou Jaahm
Jyutpingmaa5 mou6 zaam6
General information
LocationSoutheast of intersection between Huangshi East Road (黄石东路) and Airport Road (机场路)
Yuncheng Subdistrict, Baiyun District, Guangzhou, Guangdong
China
Coordinates23°12′15.08″N 113°15′30.20″E / 23.2041889°N 113.2583889°E / 23.2041889; 113.2583889
Operated byGuangzhou Metro Co. Ltd.
Line     Line 14
Platforms2 (1 island platform)
Tracks2
Construction
Structure typeUnderground
AccessibleYes
Other information
Station code1405
History
Opened29 September 2025 (4 months ago) (2025-09-29)
Services
Preceding station Guangzhou Metro Following station
Xinshixu
towards Lejia Road
Line 14 Hebian
towards Dongfeng
Location

Mawu station (simplified Chinese: 马务站; traditional Chinese: 馬務站; pinyin: Mǎwù Zhàn; Cantonese Yale: Máamou Jaahm) is a station on Line 14 of the Guangzhou Metro. It is located on the southeast of the junction between Huangshi East Road and Airport Road in the Yuncheng Subdistrict of Baiyun District in Guangzhou. It opened on 29 September 2025.[1]

Station Layout

Station Floorings

The station has three floors and is 140 metres (460 ft) long. The ground level serves as the station's entrances and exits, and is surrounded by the Airport Road [zh] and Airport Expressway [zh] viaducts, the Huangshi Interchange, Huangshi Road, the Baiyun District People's Court, and adjacent buildings. The first underground floor serves as the station concourse, the second underground floor is the station equipment floor, and the third underground floor houses the Line 14 platform. Due to the complex surrounding environment, the main structure of the station was largely constructed using the cut-and-cover method.[2]

Concourse

The concourse is equipped with ticket vending machines and an intelligent customer service center.

To facilitate pedestrian access, the east side of the concourse is designated as a paid area. Within this area, dedicated elevators, escalators, and stairs provide easy access to the platforms.

Platforms

The station has an island platform located underground on the east side of Airport Road. Toilets and a nursing room are located at the platform end heading towards Xinshixu.[3]

Entrances/exits

The station has 2 points of entry/exit, with Exit C being accessible via elevator.

  • A: Airport Road, Huangshi East Road, Caiyun Road, Guangzhou Baiyun District People’s Court
  • C: Airport Road, Huangshi West Road Wheelchair user access

History

The original plan for the second phase of Line 14 was to set up Huangshi Road station to the south of this station.[4] Later, several stations were added to the line, with the original Huangshi Road Station moved south to become Xinshixu station, and this station was added to the north of the original Huangshi Road Station. Finally, the second phase of Line 14 was approved, and construction of the station was carried out. During this period, the station was named Mawu Station. In July 2025, the Guangzhou Municipal Transportation Bureau announced the preliminary station names for the second phase of Line 14, and this station retained its current name. However, this station is actually closer to a place called Huangshi, so some netizens suggested that this station be named Huangshi station and the name Mawu be reserved for the station on Line 24 to the east of this station, currently named Huangshi Station.[5] This suggestion was ultimately not adopted by the relevant departments, and the station was officially named Mawu station in September 2025.[6]

The station completed the bottom slab sealing in October 2023.[7] The main structure topped out in March 2024,[8] and the "three rights" transfer was completed in July 2025.[2] The station was put into operation on 29 September 2025.[1]

Future development

The station is planned to be an interchange with Line 29, and a transfer node was reserved during construction.[9]

References

  1. 1 2 李天研 (28 September 2025). "广州地铁官宣:3条(段)城际铁路2条(段)地铁9月29日开通" [Guangzhou Metro officially announced: 3 intercity railway lines (sections) and 2 subway lines (sections) will open on 29 September]. Guangzhou Daily. Archived from the original on 28 September 2025. Retrieved 29 September 2025.
  2. 1 2 郑慧梓 (10 July 2025). "广州地铁两条年内开通新线有新动向!多座车站完成"三权"移交" [Guangzhou Metro has two new lines opening this year, with new developments! Multiple stations have completed the transfer of "three rights".]. Nanfang Daily (in Simplified Chinese). Archived from the original on 10 July 2025. Retrieved 5 October 2025.
  3. "广州地铁卫生间、母婴室和AED信息" [Guangzhou Metro toilets,nersery rooms and AED information]. Guangzhou Metro (in Simplified Chinese). Guangzhou. 27 June 2025.{{cite web}}: CS1 maint: url-status (link)
  4. "广州市轨道交通十四号线一期及知识城支线工程环境影响报告书(简本)" [Environmental Impact Report for Guangzhou Metro Line 14 Phase I and Knowledge City Branch Project (Simplified Version)] (PDF). Guangzhou Metro Corporation (in Simplified Chinese). Archived from the original (PDF) on 24 March 2024. Retrieved 3 October 2025 via Ministry of Environmental Protection of the People's Republic of China.
  5. 李天研 (14 July 2025). "广州地铁两段新线站名公示,珠村、朱村同音怎么分?" [The station names of two new lines of Guangzhou Metro have been announced. How to distinguish between Zhucun and Zhucun, which have the same pronunciation?]. Guangzhou Daily (in Simplified Chinese). Retrieved 3 October 2025.
  6. "广州市民政局地名公告(20250915)" [Guangzhou Civil Affairs Bureau Place Name Announcement (20250915)]. Guangzhou Civil Affairs Bureau (in Simplified Chinese). 15 September 2025. Archived from the original on 15 September 2025. Retrieved 3 October 2025.
  7. "【工程建设】广州地铁十四号线二期项目马务站底板封底工作顺利完成" [【Construction】The bottom slab sealing work of Mawu Station of Guangzhou Metro Line 14 Phase II project has been successfully completed]. Guangdong Construction Group (in Simplified Chinese). 25 October 2023. Archived from the original on 21 December 2023. Retrieved 3 October 2025 via Southern Network.
  8. 郑慧梓 (18 March 2024). "广州在建地铁进度更新!14号线二期土建进度过半" [Guangzhou Metro Construction Progress Update! Line 14 Phase 2 Civil Construction Progress Passes Halfway]. Nanfang Daily (in Simplified Chinese). Archived from the original on 18 March 2024. Retrieved 5 October 2025.
  9. 李天研 (26 July 2018). "两条地铁新线各增一换乘站" [Two new subway lines each add a transfer station]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 30 August 2018. Retrieved 18 October 2025 via Sina News.