| Simister Island | |
|---|---|
Simister Island in 2021 | |
| Greater Manchester | |
![]() Interactive map of Simister Island | |
| Location | |
| Simister, Greater Manchester, England | |
| Coordinates | 53°32′59″N 2°15′38″W / 53.54982°N 2.26061°W |
| Roads at junction | |
| Construction | |
| Type | Multi-level motorway interchange |
| Opened | 1971 (original layout) |
| Maintained by | National Highways |
Simister Island is a major motorway interchange at junction 18 of the M60 in the Metropolitan Borough of Bury, Greater Manchester, England. It is approximately 8 miles (13 km) north of Manchester city centre and about 3 miles (4.8 km) south of Bury, near the village of Simister. The interchange connects three key routes: the M60 orbital, the M62 trans-Pennine route, and the M66 motorway, serving as a critical hub for both regional and national traffic.
It is one of the busiest motorway junctions in North West England, handling approximately 90,000 vehicles per day. The interchange plays an important role in linking Greater Manchester with Lancashire, Yorkshire, and beyond. However, it has long been associated with severe congestion, unreliable journey times, and safety concerns due to traffic volumes far exceeding its original design capacity. To address these issues, a major upgrade has been approved, including new free-flow links, carriageway widening, and improved connectivity, with construction expected to begin after March 2026.
History
Simister Island was constructed in 1970–71 as part of the development of the M62 motorway, which provided a key east–west link across the Pennines. It opened in 1971[1] as a two-level roundabout[2] designed to accommodate future connections to the planned Bury Easterly Bypass (now the M66).[3] At the time, traffic volumes were modest, and the layout reflected the standards of the era, with limited free-flow links and reliance on signal-controlled movements.
By the late 1990s, traffic growth had far exceeded the junction's original capacity. The creation of the M60 orbital motorway incorporated Simister Island into the ring road network, greatly increasing its strategic importance. In 1999 the interchange was upgraded with free-flow slip roads for all left-turn movements, a widened four-lane circulatory carriageway, and colour-coded spiral markings to guide vehicles through the newly signal-controlled junction.[2] Despite these improvements, the layout continued to struggle with rising demand, resulting in chronic congestion and safety concerns.[4]
The need for improvements was first identified in the Route Based Strategy Evidence Report (2014).[5] In March 2020, the UK Government's Road Investment Strategy 2 (RIS2) committed to upgrading the junction.[6]
Two potential improvement options were considered:
- Inner Links: This proposal focused on modifying the existing roundabout by widening the circulatory carriageway and slip roads, converting the hard shoulder to a live lane between junctions 17 and 18, and upgrading signals and signage. While it would have improved capacity, it relied on signal-controlled movements and complex lane arrangements, offering limited long-term benefits.[7]
- Northern Loop: This option introduced a new free-flow link between the M60 northbound and westbound, reducing reliance on the roundabout and improving journey time reliability. National Highways concluded that Northern Loop provided greater capacity, better safety, and less disruption during construction, making it the preferred option.[7]
The scheme was classified as a Nationally Significant Infrastructure Project (NSIP) under the Planning Act 2008, requiring a Development Consent Order (DCO).[8] The DCO application was submitted in April 2024, examined between September 2024 and March 2025, and approved by Heidi Alexander, the Secretary of State for Transport, on 9 September 2025.[9] This decision followed extensive environmental assessments, statutory consultations, and local authority engagement.[10][11]
Future development plans
The approved upgrade at Simister Island will involve several major interventions to improve traffic flow and capacity. A key feature is the Northern Loop construction, which will introduce a new free-flow link from the M60 eastbound to the M60 southbound, bypassing the current roundabout.[7] This will include the construction of the Pike Fold Viaduct, designed to carry traffic over existing infrastructure.[12]
Additional free-flow links will also be created, including a two-lane connection from the M60 northbound to the M60 westbound, replacing the existing single-lane link.[7] To accommodate growing traffic volumes, the M60 between junctions 17 and 18 will be widened to five lanes in each direction, with the hard shoulder converted into a permanent traffic lane.[7] The M66 southbound will also be realigned and expanded to four lanes through the interchange, improving connectivity for traffic heading toward Manchester.[13]
Alongside these major works, ancillary improvements will include upgraded signage, drainage systems, and environmental mitigation measures to reduce noise and air quality impacts on nearby communities.[14]
The scheme is anticipated to provide economic benefits by facilitating development within Atom Valley, a strategic growth area in Rochdale and Bury. It is projected to enable up to 20,000 jobs, support the delivery of approximately 7,000 homes, and contribute an estimated £1 billion to the regional economy.[15]
Although planning consent has been granted, construction is expected to begin after March 2026, following confirmation in the next Road Investment Strategy.[16] The build phase is anticipated to last approximately two years, with completion projected around 2028.[17]
Public opinion
The proposed upgrade has generated mixed reactions among local communities and stakeholders. Many residents and businesses welcome the improvements,[7] citing the potential for reduced congestion, improved journey times, and economic growth. Supporters argue that the scheme is essential for unlocking development opportunities in the region, including the Atom Valley Mayoral Development Zone.[18][19]
However, concerns have also been raised about the project's environmental impact and whether it will fully resolve traffic issues. Residents in nearby areas such as Prestwich, Whitefield, and Simister have expressed worries about increased noise and air pollution, despite planned mitigation measures including noise barriers and air quality monitoring.[20] Questions have also been posed about whether the upgrade could shift congestion onto local roads rather than eliminating it entirely.[12]
The estimated cost of £207–£340 million[21] has sparked debate over value for money, with some suggesting that investment in public transport might offer a more sustainable solution.[11] Additionally, the timeline—construction starting after March 2026 and completing around 2028—has led to calls for interim measures to ease congestion before the full upgrade is delivered.[12]
See also
References
- ↑ "M62 Eccles to County Boundary". Chartered Institution of Highways & Transportation. Retrieved 25 November 2025.
- 1 2 Grimsditch, Lee (28 July 2024). "From a 'spy tower' to a Cold War relic - 10 landmarks you see driving on the M60". Manchester Evening News. Retrieved 25 November 2025.
- ↑ Duggan, Ciaran (10 October 2018). "Nostalgia: New motorway link into Manchester". Lancashire Telegraph. Retrieved 25 November 2025.
- ↑ "Major Overhaul Proposed for Simister Island Interchange as Ground Surveys Begin". Highways Industry. 23 May 2025. Retrieved 25 November 2025.
- ↑ M60/M62/M66 Simister Island Interchange | TR010064 | Environmental Statement Non-Technical Summary (PDF). Planning Inspectorate (Report). National Highways. December 2024. Retrieved 25 November 2025.
- ↑ Middleton-Pugh, Jessica; Townsend, Sarah (11 March 2020). "Budget 2020 | Sunak pledges £600bn for UK infrastructure". Place North West. Retrieved 25 November 2025.
- 1 2 3 4 5 6 M60 junction 18 Simister Island interchange | Preferred route announcement (PDF). Highways England (Report). January 2021. Retrieved 25 November 2025.
- ↑ "Simister Island Development Consent Order" (PDF). Bury Council. 14 February 2024. Retrieved 24 November 2025.
- ↑ "M60/M62/M66 Simister Island". Planning Inspectorate. Retrieved 24 November 2025.
- ↑ "M60 junction 18 Simister Island Interchange". National Highways. 10 September 2025. Retrieved 24 November 2025.
- 1 2 Morris, Huw (15 September 2025). "Major upgrade to Simister Island granted approval". The Planner. Retrieved 24 November 2025.
- 1 2 3 Gee, Chris (12 October 2025). "Six big questions answered on the Simister Island upgrade". Bury Times. Retrieved 25 November 2025.
- ↑ "M60/M62/M66 Simister Island development consent decision announced". Planning Inspectorate Press Office. Planning Inspectorate. 9 September 2025. Retrieved 25 November 2025.
- ↑ Morby, Aaron (9 September 2025). "Costain wins consent for £130m M60 Simister Island upgrade". Construction Enquirer. Retrieved 25 November 2025.
- ↑ Lythgoe, George (29 September 2025). "More progress for £340m Simister Island motorway upgrade". Bury Times. Retrieved 25 November 2025.
- ↑ "Simister Island £340m Motorway Upgrade Moves a Step Closer". Highways Industry. 30 September 2025. Retrieved 25 November 2025.
- ↑ Slater, Chris (10 September 2025). "Exactly what huge Simister Island project means for drivers on the M60, M62 and M66". Manchester Evening News. Retrieved 25 November 2025.
- ↑ "TfN has welcomed approval for plans to relieve congestion at Simister Island in Greater Manchester". Transport for the North. 12 September 2025. Retrieved 25 November 2025.
- ↑ Northern Gateway (Governance / Investment Zone) - Part A (PDF). Bury Council (Report). Leader and Cabinet Member for Strategic Growth. 25 September 2025. Retrieved 25 November 2025.
- ↑ Lush, Rebecca (28 March 2023). Response to: M60/M62/M66 Simister Island Interchange Statutory Consultation (PDF). Transport Action Network (Report). Retrieved 25 November 2025.
- ↑ Gee, Chris (10 September 2025). "Two-year plan to fix notorious motorway junction". BBC News. Retrieved 25 November 2025.
External links
- Simister Island Interchange via National Highways