Baishitang station

Wikipedia

Baishitang

白石塘
Shenzhen Metro
Platform
Chinese name
Chinese白石塘
Transcriptions
Standard Mandarin
Hanyu PinyinBáishítáng
Yue: Cantonese
Yale RomanizationBaahksehktòng
JyutpingBaak6sek6tong4
General information
LocationIntersection of Jixiang Road (吉祥路) and Fuzhao Street (福照街)
Pingdi Subdistrict, Longgang District, Shenzhen, Guangdong
China
Coordinates22°46′26.324″N 114°17′5.651″E / 22.77397889°N 114.28490306°E / 22.77397889; 114.28490306
Operated bySZMC (Shenzhen Metro Group)
Line     Line 3
Platforms2 (1 island platform)
Tracks2
Construction
Structure typeUnderground
AccessibleYes
History
Opened28 December 2024 (13 months ago) (2024-12-28)
Services
Preceding station SZM Shenzhen Metro Following station
Low Carbon City Line 3 Fuping
Location

Baishitang station (Chinese: 白石塘; pinyin: Báishítáng Zhàn; Jyutping: Baak6sek6tong4 Zaam6; Cantonese Yale: Baahksehktòng Jaahm) is a station on Line 3 of Shenzhen Metro. It opened on 28 December 2024,[1] and is located underground in Pingdi Subdistrict in Longgang District.[2]

The station is part of the fourth phase of Line 3 (East Extension).[3][4]

Station layout

G - Exits A-D
B1F
Concourse
Lobby Ticket Machines, Customer Service, Shops, Vending Machines
B2F
Platforms
Platform arrow for L 3 towards Futian Bonded Area (Low Carbon City)
Island platform, doors will open on the left
Platform 3 towards Pingdi Liulian (Fuping) arrow for R

Entrances/exits

The station has 4 points of entry/exit, with Exits A and C being accessible via elevators. Exit B has a toilet.

  • A: Jixiang Road, Fuzhao Street Wheelchair user access
  • B: Zhenxing Road, Pingdi Park
  • C: Zhenxing Road Wheelchair user access
  • D: Xiangji Road

References

  1. "定了!深圳地铁13号线南段明日开通" [It’s settled! The southern section of Shenzhen Metro Line 13 will open tomorrow]. Shekou News (in Simplified Chinese). 27 December 2024. Retrieved 19 January 2025.
  2. "深圳地铁3号线东延线近期开建,延至低碳城和坪地" [Shenzhen Metro Line 3 East Extension Line will be built soon, extending to Low Carbon City and Pingdi]. Shenzhen Business Daily (in Simplified Chinese). 28 July 2020. Archived from the original on 8 October 2020. Retrieved 19 January 2025.
  3. "深圳地铁集团党委书记、董事长辛杰参加《民心桥》节目听众问题的落实情况" [The implementation of the audience's questions raised by Xin Jie, Party Secretary and Chairman of Shenzhen Metro Group, on the "Bridge of People's Hearts" program]. Shenzhen Government Online (in Simplified Chinese). 8 September 2020. Archived from the original on 9 October 2020.
  4. "深圳地铁3号线东延"可研"获批!开工在即!建设工期为5年" [Shenzhen Metro Line 3 East Extension "Feasibility Study" approved! Construction is about to start! The construction period is 5 years]. Shenzhen News Network (in Simplified Chinese). 24 July 2020. Archived from the original on 9 October 2020. Retrieved 19 January 2025.